Connect With Us

Looking for help with a proposal or quote? Interested in scheduling a consultation or onsite visit?

Choose an option below to get connected with your local Heritage representative.

Now Hiring!

Heritage is now hiring in the positions of Drivers, Material Handlers, Lab Chemists and more.

2022 Sustainability Report is now available. Click here to view.

We are changing the delivery method for your completed manifests. Learn more.

Join Our Team Customer Login
Ten Steps Uniform Hazardous Waste Paper

News

10 Steps to Uniform Hazardous Waste Manifest Completion

Posted: 1/31/13

Category:

Service Type(s): #Hazardous Waste Regulations

Share:

This is another excerpt taken from our RCRA training literature. The following is a good list of steps to take to ensure proper hazardous waste manifest completion.

1. Complete all federally required information.

2. Complete the state required information, if any, for the TSD state.

3. Complete the state required information, if any, for the generator’s state.

4. Complete TSD specific information, if any. (For example: a TSD may require waste stream numbers).

5. Review the manifest. Is all information complete and correct? Are all copies legible?

6. Read the generator’s certification and sign the manifest.

7. Complete, review, and sign LDR form, as applicable.

8. Have the first transporter sign the acknowledgement of receipt of materials. Be sure to check that the vehicle placarding and container labels are correct, check container counts and agree with driver.

9. Remove appropriate copies of the manifest. Retain a copy of the LDR, as applicable.

10. File appropriate copies of manifest, a copy of LDR form, and additional documents.

Some Additional Tips

  • After the initial completion of the manifest and subsequent signatures and changes, check to make certain all marks are legible on all copies.
  • Maintain a log, either written or by computer, to track open manifests and manifest document numbers.
  • Corrections that are made should be accompanied by initials and date (ASM 6/30/06). Corrections in type and quantity require contact between the generator and TSD. If these corrections are made by telephone, both parties should date and initial the change.
  • All changes should be made by line out and initials (F006 D008 ASM 6/30/94). Do not use correction tapes or liquids.
  • Maintain a working relationship with government agencies.

More News From Heritage